Customer report
The customer reported that the hot water system was fluctuating between hot and cold. The initial quote details included checking the pressure and replacing the hot water unit. The existing unit was recorded as a 1999 model.
Diagnosis & Technical Assessment
At the initial attendance, the hot water system was recorded as fluctuating between hot and cold. The existing unit was identified as a 1999 model, and a gas test was completed. The proposed replacement was a Rinnai Infinity 28i with a flue kit. The work notes record that Harry at Kew Reece spoke with Rinnai head office and received confirmation that the proposed unit would work for the installation.
The replacement scope also identified the existing roof flue arrangement as part of the installation work. The existing flue was to be removed from the roof, with the same roof opening used for the new vertical flue. Roof penetration instructions specified under-sealing to the clip-lock roof and over-sealing.
The recorded assessment combined the reported temperature fluctuation, the age of the existing hot water unit, the gas test at the unit, and confirmation of the selected replacement system and flue arrangement before installation proceeded.
All work was completed in accordance with the Victorian Building Authority (VBA) regulatory framework.
Solutions delivered
The existing hot water unit was replaced with a new gas Rinnai 28i system. The completed work included installation of the new unit, a new flue routed vertically through the roof, and a condensation drain. Pipework alterations were also recorded as part of the installation. The selected Rinnai Infinity 28i and flue kit had been checked through Kew Reece and Rinnai before the installation proceeded.
The work scope used the existing roof opening for the replacement flue after removal of the old flue, with sealing instructions recorded for the clip-lock roof penetration. Materials prepared for the work included a valve kit, copper, B-press fittings, lagging, a temperature valve and compression fittings.
Tools, Parts & Systems Used
- Hand tools
- Power tools
- Benders
- Tin snips
- Ladder
- Rinnai Infinity 28i with flue kit
- Copper
- Valve kit
- B-press fittings
- Compression fittings
- Gas hot water system
- Flue
- Condensation drain
Outcome & Results
The completion notes recorded that the new Rinnai gas unit, flue, and condensation drain had been installed. The installation was tested and commissioned after the work was completed. The technician recorded that everything was working well.
All work was carried out in accordance with relevant Australian Standards and safety requirements.
Repair vs Replacement
For this job, a replacement was selected after the existing hot water system was reported to fluctuate between hot and cold and was recorded as a 1999 unit. The work record also shows that the proposed Rinnai Infinity 28i was assessed for suitability prior to installation. In comparable job records, the repair-versus-replacement decision depends on the observed fault, the condition and age of the existing unit, the available diagnostic information, and whether a replacement system can be installed within the existing service and flue arrangement. Here, the documented work proceeded as a replacement rather than a component repair.